Payment Type: | T/T |
---|---|
Incoterm: | FOB,CFR,CIF,EXW,FCA |
Delivery Time: | 15 Days |
Additional Info
Packaging: Carton
Transportation: Ocean,Land,Air
Place of Origin: China
Certificate: ISO9001
HS Code: 854890
Port: Qingdao
Product Description
High quality 6A 380V Three Phase Power Noise AC Filtermade by FILTEMC
Featrues of AC Noise Filter
--With three stage filtering design, special materials can guarantee the high impedance characteristics in wide frequency range
--Assure the smooth operation of other electronic devices in the vicinity, and solve the interference problems of inverter.
--Copper bar terminals applied for versions above 250A to keep pace with international standard, easy and safe connection
--Customized products according to customer's requirements
Applications of AC Power Filter
--Suitable for most brands of inverters
--Servo motor
--UPS/SMPS
--Industrial electronic equipment by using frequency conversion principle
Rated voltage: 250/440VAC,50/60Hz
Operating frequency: DC to 60Hz
Rated currents: 3~1200A@40°C
Hipot Rating: L-N 1600VDC
L/N-G 4000VDC
Overload Current: 1.5x rated current for 1 minute, once per hour
Climatic category: -25°C~+85°C(25/85/21)
Design corresponding to: UL1283, CSA C22.2 No.8,
IEC/EN 60939,
CQC GB 15288/GB 15287-2008
Flammability corresponding to: UL 94V-0
Advantages of FILTEMC
1.FILTEMC IS A COMPANY WITH OVER 15 YEARS EXPERIENCE IN EMI FILTER MANUFACTURING
2.OUR VALUE MESSAGE IS "QUALITY IS OUR CULTURE"
3.WITH US YOUR MONEY IN SAFE YOUR BUSINESS IN SAFE
4.OUR COMPETENCIES HAVE GOT MANY CERTIFICATE (cUL/TUV/CQC/CE/ROHS)
Packaging of AC Power Noise Filter
Power Line Filter: CTN/300pcs
N/G W.: 13.5/14.3KG
Measures:0.565*0.285*0.225m
Shipment
---Shipping terms: DHL, UPS, FEDEX, TNT, EMS
---Port is Qingdao or as requests.
FAQ for 6A 380V Three Phase Power Noise AC Filter
1. What is your biggest advantage?
We have more than 15 years on EMI FILTER manufacturing, and all of products have got cUL, TUV, CE, CQC, ROHS certificate.
2. How long will your product be delivered?
It's about 15 days.
3. Can you do OEM?
Yes, if your demand can reach the minimum order quantity of OEM.
4.Can I go to see your factory or company?
You are always welcome to visit our factory.